fbpx
 

TRESORER II – SAI Design Office

  • TRESORER II – SAI Design Office
  • TRESORER II – SAI Design Office

THE CHALLENGE

  • Reduce time for workshop drawings and manufacturing files

 

THE SOLUTION

  • Compatibility and use of AutoCAD

 

USERS’ BENEFITS

  • – Reduce project time
  • – 20% productivity gains

 

“Advance Steel enabled us to save a lot of time during the design phase and frames’ manufacturing. This is a very reactive software solution in case of modifications of the project.”
Mr. Fenix, Draftsman

  • Location: Massy, France
  • Contracting authority: GE
  • Dimensions: 10m x 5m
  • Specifications: Surface, 50 m², Weight: 1500 kg

GRAITEC GROUP 2020 | WE'VE UPDATED OUR PRIVACY NOTICE - Click here to find out more about how we collect, store and handle your personal data and your rights.