fbpx
 

Holly House Hospital

  • Holly House Hospital
  • Holly House Hospital
  • Holly House Hospital

Business issues

  • – Tying our design of our balustrade to an already built concrete stair
  • – Designing a stair which could be built in the factory and erected in a tight and cramped stair well

 

Business results

  • – Visualize the project as a whole unit
  • – Display design clashes to the client when they arose
  • – Ease of design of the perforated panels

 

“Spent more time designing the model, and less time on the fabrication drawing, rather the other way around.”

Padraig Kelly, Contracts Assistant, Samka Architectural Solutions

  • Location: Reading, Berkshire, UK
  • Software used: Autodesk Advance Steel
  • Customer: SAMKA ARCHITECTURAL SOLUTIONS

GRAITEC GROUP 2020 | WE'VE UPDATED OUR PRIVACY NOTICE - Click here to find out more about how we collect, store and handle your personal data and your rights.