ARS ELECTRONICA CENTER
  • ARS ELECTRONICA CENTER
  • ARS ELECTRONICA CENTER
  • ARS ELECTRONICA CENTER
  • ARS ELECTRONICA CENTER
  • ARS ELECTRONICA CENTER
  • ARS ELECTRONICA CENTER
  • ARS ELECTRONICA CENTER
  • ARS ELECTRONICA CENTER

THE CHALLENGE

· Very specific geometry of the center
· The steel glass façade had to match the 3D geometry of the building

THE SOLUTION

· The specific geometry required the creation of the façade to be done with a 3D CAD system like Advance Steel
· Processing of the entire 3D model data

 

“Advance Steel processes the entire 3D model data, accelerates all document creation and ensures all-around drawing consistency.”

Mr. Moser,
Project Manager

USERS’ BENEFITS

· 3D modeling
· Intelligent connections and NC-files
· Ease of use and short learning curve

  • Location: Linz, Austria
  • Architecture Office: Treusch Architecture ZT
    GmbH
  • Contracting authority: Immobilien Linz GmbH &
    Co.KG
  • Dimensions: 5.000 m2 sheathing of the building,
    1.100 m2 grating
  • Specifications: 200 tons of steel, 1.100 glass

GRAITEC GROUP 2017 At GRAITEC we take privacy seriously. Please read our privacy policy.