Launch the Verify command to perform a model verification. The process is similar to the one performed during Calculate but the software does not design anymore the theoretical reinforcement areas but uses the real reinforcement in place and performs all required verifications. Useful when the wall is not calculated after preliminary sizing, when reinforcement cage is customized after calculation or when reinforcement cage is manually defined from scratch.
When applying the Calculate or Verify commands, the Errors and warnings tab in the console displays warning and error messages regarding the design of the wall.

Errors and warnings tab
The main warnings and errors that may appear in the console are:
Additional horizontal bars have been generated to cover the required horizontal and/ or shear reinforcement area even if the chosen reinforcement type is fabrics.
Fck value is too big.
The longitudinal diameter %2.f [diameter value] recommended by seismic dispositions is not available!
The transversal diameter %2.f [diameter value] recommended by seismic dispositions is not available!
The lintel for the opening n°%d [opening ID]is not reinforced, but seismic dispositions were activated.
Buckling length for the unreinforced wall is too large.
Buckling length for the reinforced wall is too large.
Concrete stress in the middle of the wall is exceeded, the wall was set as reinforced.
Slenderness for the unreinforced wall is too large, a column verification is recommended.
Slenderness for the reinforced wall is too large, a column verification is recommended.
Maximum spacing between vertical bars is exceeded (longitudinal direction).
Maximum spacing between horizontal bars is exceeded (vertical direction).
Maximum spacing between transversal bars is exceeded.
Minimum clear spacing between vertical bars not respected (longitudinal direction).
Minimum clear spacing between horizontal bars not respected (vertical direction).
Minimum clear spacing between vertical bars not respected (transversal direction).
Minimum clear spacing between horizontal bars not respected (transversal direction).
Minimum spacing between transversal bars not respected.
Maximum spacing between vertical bars is exceeded (transversal direction).
Maximum spacing between horizontal bars is exceeded (transversal direction).
Tensioned zone verification check failed. Reinforced wall required.
There are no available fabrics to cover the required vertical reinforcement area, relaunch the calculation considering bars for the main reinforcement.
There are no available fabrics to cover the required horizontal reinforcement area, relaunch the calculation considering bars for main reinforcement type.
There are no available bars to cover the required reinforcement area.
Initial eccentricity is too large, a column verification is recommended.
Stress at the top of the wall is exceeded.
Stress in the middle of the wall is exceeded.
Concrete stress at the bottom of the wall is exceeded, the wall was set as reinforced.
Stress at the bottom of the wall is exceeded.
Stiffener width is smaller than the minimum confined length.
Concrete stress at the top of the wall is exceeded, the wall was set as reinforced.
Out of plane loads: concrete stress is exceeded.
Out of plane loads: reinforcement stress is exceeded.
There are no available fabrics.
No earthquake calculation other than EC8.
Warning: The verifications according to EC8 were performed with the accidental ULS combinations, not with the fundamental ones.
Attention: Chamfers are not allowed for seismic dispositions.
You have imposed an unreinforced wall behavior but the shear stress is greater than fcvd. Switch to reinforced wall.
There are no available fabrics to cover the required reinforcement area (wall web), relaunch the calculation considering bars for the main reinforcement.
Insufficient wall length for EC8 dispositions.
Insufficient wall-length according to EC8 dispositions (5.1.2).
Concrete resistance incompatible with the seismic dispositions for the main element.
Concrete resistance incompatible with the seismic dispositions for the main element (C20/25-C50/60-DCH).
Concrete resistance incompatible with the seismic dispositions for the main element (C16/20-C50/60-DCH) - Steel ductility.
DCM - steel ductility B or C.
DCH - steel ductility C.
Steel resistance incompatible with the seismic dispositions for the main element, reinforcement type has to be set on bars.
The shear stress VEd at the bottom of the wall is greater than VRd. Please increase the wall thickness or the concrete quality!
EN1992-1-1/§ 6.2.1: The compression stress in the concrete strut is greater than VRd, Max. Please increase the wall thickness or the concrete quality!
The shear stress V* at the bottom of the wall is greater than VRd. Please increase the wall thickness or the concrete quality!
EN1998-1-1/§ 5.5.3.4.2: The verification V * < 0.4 * VRd, Max in critical zone (ductile wall DCH) is not passed.
EN1998-1-1/§ 5.5.3.4.4: The verification for sliding shear failure (VEd < VRd, s) is not passed.
Attention, the opening is not taken into account for the shear verification.
The compression stress in the concrete struts is greater than VRd, Max. Please increase the wall thickness or the concrete quality!
Horizontal bars: insufficient real reinforcement area (EN 1998, art. 5.5.3.4.3 a).
Vertical bars: insufficient real reinforcement area (EN 1998, art. 5.5.3.4.3 b).
Strut and Tie method: stress in concrete strut is exceeded.
Insufficient wall thickness.
Insufficient concrete class for the selected exposure class (see table E. 1N from EN1992-1-1).
Undetermined reinforcement.
Vertical bars: insufficient real reinforcement area.
Vertical bars: insufficient real reinforcement area (edge stiffeners).
Maximum spacing between transversal bars is exceeded (longitudinal direction).
Maximum spacing between transversal bars is exceeded (vertical direction).
Vertical bars: insufficient real reinforcement area (edge stiffeners). Vertical bars: insufficient real reinforcement area (wall web).
The shear at the interface between concrete cast at different times verification according to EC8 dispositions is not passed (VEdi > VRdi). The VRdi value corresponds to 0.30 (1-fck/250) fcd; the vertical reinforcement area has been increased to satisfy the sliding shear failure verification.
The shear at the interface between concrete cast at different times verification according to EC8 dispositions is not passed (VEdi > VRdi). The VRdi value corresponds to 0.30 (1-fck/250) fcd; the vertical reinforcement could not be increased to satisfy the sliding shear failure verification.
The shear at the interface between concrete cast at different times verification according to EC8 dispositions is not passed (VEdi > VRdi). The vertical reinforcement has been increased to satisfy the sliding shear failure verification.
The shear at the interface between concrete cast at different times verification according to EC8 dispositions is not passed (VEdi > VRdi). Additional interface reinforcement can be provided by activating the corresponding option in Reinforced Concrete dialog.
The shear at the interface between concrete cast at different times verification according to EC8 dispositions is not passed (VEdi > VRdi).
The shear at the interface between concrete cast at different times verification according to EC8 dispositions is not passed (VEdi > VRdi).
The shear at the interface between concrete cast at different times verification is not passed (VEdi > VRdi). The VRdi value corresponds to 0.30 (1-fck/250) fcd; the vertical reinforcement area has been increased to satisfy the sliding shear failure verification.
The shear at the interface between concrete cast at different times verification is not passed (VEdi > VRdi). The VRdi value corresponds to 0.30 (1-fck/250) fcd; the vertical reinforcement could not be increased to satisfy the sliding shear failure verification.
The shear at the interface between concrete cast at different times verification is not passed (VEdi > VRdi). The vertical reinforcement has been increased to satisfy the sliding shear failure verification.
The shear at the interface between concrete cast at different times verification is not passed (VEdi > VRdi). Additional interface reinforcement can be provided by activating the corresponding option in Reinforced Concrete dialog.
The shear at the interface between concrete cast at different times verification is not passed (VEdi > VRdi).
The wall is too slender for the simplified strips method. Please select the "Composed bending considering edge stiffeners" method in Design Assumptions dialog.
Horizontal bars: Insufficient real reinforcement area.
Attention, interaction curves verification considering the applied resultant forces on group were not performed! Launch Interaction Curves tool to perform this verification!
You have activated a seismic calculation with strips method. A composed bending calculation is recommended.
Traction efforts in strips were detected, the calculation in composed bending is recommended (more economical).
Attention, the plastic hinge has a capacity of rotation not compliant with the global ductility of the wall.
There are no available fabrics to cover the required reinforcement area (wall web-out of plane verification), relaunch the calculation considering bars for main reinforcement type (out of plane verification).
There are efforts that are outside of the interaction surface ULS (ULSA).
Vertical bars: Insufficient real reinforcement area (wall web-out of plane).
Number of layers should be 2 (on both faces of the wall).
The wall is too slender for the simplified strips method.
Vertical bars (concrete interfaces): Insufficient real reinforcement area.
The diameter of the generated reinforcement exceeds the maximum diameter.
The spacing between bars is too large
Stiffener transversal diameter too small.
No error detected.
Horizontal bars diameter too small (CR 2-1-11.1).
Vertical bars diameter too small - current zone (CR 2-1-11.1).
Vertical bars diameter too small – stiffener (CR 2-1-11.1).
Vertical bars diameter too small - current zone.
Vertical bars diameter too small - stiffener.
Vertical bars diameter too small - current zone.
Vertical bars diameter too small – stiffener.
Vertical bars diameter too small - current zone.
Vertical bars diameter too small – stiffener.
Vertical bars diameter too big.
Horizontal bars diameter too big.
Insufficient wall thickness.
Insufficient wall thickness for EC8 dispositions (5.4.1.2.3).
Insufficient wall thickness for EC8 dispositions (5.4.3.4.2(10)).
Insufficient wall length (length< 4 x thickness), a column verification is recommended.
Wall is set as free at one edge and this may affect its axial resistance. Please review the buckling assumptions.
Design shear force was calculated according to article 5.4.2.4 from EN 1998-1, Figure 5.4, diagram 'b'. Please manually define the envelope shear force (Loads dialog) otherwise, diagram 'c' will be neglected.
Newmark combinations were not generated, please activate them in the Combinations dialog.
Opening: Lintel real area smaller than the theoretical area.
Opening reinforcement: Insufficient lintel transversal bars.
Concrete cover does not comply with norms provisions.