Internal efforts  

 

The Internal efforts tab in Loads definition includes two load options:

 

 

 

 

The Top Loads dialog box

 

The Top Loads dialog box

 

 

 

 

 

 

 

The Bottom Loads dialog box

 

 

The Bottom Loads dialog box

 

 

 

 

The dialogs include a table where current loads in the project are defined, as well as:

 

 

 

 

 

 

 

 

 

 

 

 

 

Related topics