Storage and Production Hall, Czech Republic – by Promstal Engineering s.r.o.
  • Storage and Production Hall, Czech Republic – by Promstal Engineering s.r.o.
  • Storage and Production Hall, Czech Republic – by Promstal Engineering s.r.o.
  • Storage and Production Hall, Czech Republic – by Promstal Engineering s.r.o.
  • Storage and Production Hall, Czech Republic – by Promstal Engineering s.r.o.
  • Storage and Production Hall, Czech Republic – by Promstal Engineering s.r.o.
  • Storage and Production Hall, Czech Republic – by Promstal Engineering s.r.o.

Storage and production steel hall with crane. Main frames were produced with a combination of hot-rolled and welded profiles. The design of the Hall included creating it fire resistance for 15 minutes and installing a solar power-plant on the roof.

“It was clear that this project could not be effectively processed without appropriate software equipment. Thanks to Advance Design and Advance Steel, we finished the complete project from structural design – to workshop and arrangement drawings, in two months!” – Ing. Pavel Stibor CEO, Promstall Engineering s.r.o.

The Challenge

  • Design of the solar power-plant on the hall roof
  • To economically comply with the condition of horizontal deflection of columns in the crane zone
  • Providing the complete project documentation

The Solution

  • Solar power-plant was designed due to wind load in a separate project, and reactions from supports imported as actions to the hall
  • Static analysis and material design in the same model
  • Model exchange between Advance Design and Advance Steel

Users’ Benefits

  • Structural design in Advance Design
  • Project documentation in Advance Steel
  • Fast project cycle
  • Project Details: Advance Design
  • Design office: Promstal Engineering s.r.o.
  • Location: Klášterec nad Ohří, Czech Republic