Olympic Ski Jump
Software used: Advance Steel
Location: Garmisch-Partenkirchen, Germany
Design office: Bitschnau GmbH
Project description
The new ski jump for the Olympic Winter games was constructed by Bitschnau GmbH from Austria. The commission of the Bitschnau GmbH included the realization with workshop drawings and assembly of the ski jump, the referee tower and other steel elements of the jump.
|