Bridge Hochalmbahn in Bruck at the Mur
Bruck, Austria

Bridge Hochalmbahn in Bruck at the Mur, Bruck, Austria

Bridge Hochalmbahn in Bruck at the Mur
Software used: Advance Steel
Location: Bruck, Austria

Design office: NCA Container- und Anlagenbau GmbH
Construction Company: Land Steiermark

Project description:
The bridge consists of a steel framework with a welded steel arch. The cantilever construction is carried by 22 ropes which are connected to the steel arch.

Technical details:
Span: 70m
Height of the arch: 32 m
Diameter of the rope: 56 mm
Weight: approx. 380 Tons

Bridge Hochalmbahn in Bruck at the Mur, Bruck, Austria

Bridge Hochalmbahn in Bruck at the Mur, Bruck, Austria

Bridge Hochalmbahn in Bruck at the Mur, Bruck, Austria

Bridge Hochalmbahn in Bruck at the Mur, Bruck, Austria

Bridge Hochalmbahn in Bruck at the Mur, Bruck, Austria

Bridge Hochalmbahn in Bruck at the Mur, Bruck, Austria

Bridge Hochalmbahn in Bruck at the Mur, Bruck, Austria

Bridge Hochalmbahn in Bruck at the Mur, Bruck, Austria