Hospital extension
Timisoara, Romania

Hospital extension, Timisoara, Romania

Hospital extension
Software used: Advance Steel
Location: Timisoara, Romania

Client: Timisoara Town Hall
Design office: SC CON-SAM-PRO SRL

Project description:

Annex 1
The structure is made of square section steel frames, welded together. The structure rests on a poured foundation, on a ballast cushion. The structure is made of steel columns and beams. The columns and beams are HEA 220 cross sections and they are placed across over the entire body of the building. The floors are made of steel beams covered with plated glass. The terraced roof is made from corrugated tin sheets, which are insulated and waterproofed.

Annex 2
The second extension is made from steel columns, which are HEA 220 cross sections, and steel beams, which are IPE cross sections. The beams are bolted to the columns with gr 8.8 and gr 10.9 bolts. The floors are made from main and auxiliary steel beams, and concrete plates, which are 9 cm thick. The beams are jointed to the floors with Nelson bolts. The terraced roof is made from corrugated tin sheets and it is supported by beams. The secondary structure, made of rectangular pipes, is welded to the main structure, according to the architectural requirements.

Hospital extension, Timisoara, Romania

Hospital extension, Timisoara, Romania

Hospital extension, Timisoara, Romania

Hospital extension, Timisoara, Romania

Hospital extension, Timisoara, Romania

Hospital extension, Timisoara, Romania

Hospital extension, Timisoara, Romania