| Bridge Niederwartha |
Plauen Stahl Technologie GmbH |
Germany |
|
|
|
|
|
|
Software used : Advance Steel.
Plauen Stahl Technologie GmbH constructed the cable-stayed bridge between Niederwartha and Meißen. The Bridge will consist of 1232 tons of steel and will be over the Elbe River. It will be the first cable-stayed bridge in Saxonia and the longest one in Germany.
|
|
"The low error-rate and the very good capability of the drawing updates provide us with a clearer and more exact construction. We are very satisfied with Advance Steel and the use of this software was a complete success for our work."
Mr. Streit, Construction Engineer of the Plauen Stahl Technologie GMBH
|
|
| |
|
|
|
|
| Canopy for a casino. Duisburg, Germany. |
Innovations-Verbung-Syst. Gmbh |
Germany |
|
|
|
|
|
|
Software used : Advance Steel.
The canopy at the main entrance of the casino in Duisburg was designed by Innovations-Verbund-Systeme GmbH & Co. KG. The canopy has a weight of 50 tons. It is fixed to the curved walls of the building at a height of 10 meters. The span of the canopy at the front side is 30 meters. The span at the entrance wall is much smaller which makes it look like a funnel.
|
|
"We are very satisfied with the ease of use of the Access database of Advance Steel. We were also convinced by the excellent customer support, the easy operation of the software and last but not least by the good price-performance ratio. The canopy of the casino in Duisburg is one of 150 projects we have designed with GRAITEC Advance Steel.
"
Peter Mertens, Structural Engineer - Construction at Innovations-Verbung-Systeme GMBH & CO. KG
|
|
| |
|
|
|
|
| Cherkassy Beach Hotel. Cherkassy, Ukraine. |
Novotny Bauer & Partner ZT Gmbh |
Germany |
|
|
|
|
|
|
Software used : Advance Concrete.
The Cherkassy Beach Hotel was designed by Novotny Bauer & Partner Ingenieurkonsulenten für Bauingenieurwesen Ziviltechniker GmbH. The building consists of 7 floors, 2 basements, an underground parking lot, a ballroom and a bowling hall.
|
|
"The main difficulties of the project resulted from the extensive changes of the model during the planning phase and the construction phase.
Advance Concrete is an excellent software to reduce these difficulties. The fact that Advance Concrete automatically processes all information from the 3D-model leads to easy creation of the documents and enables the conformity of all drawings and documents. After the model has been updated the drawings are also automatically updated and vice versa.
"
Mr. Christian Bauer, Graduate Engineer & Manager at Novotny Bauer & Partner ZT Gmbh
|
|
| |
|
|
|
|
| Audi’s new production-hall N24. Ingolstadt, Germany. |
Stahlbau Wegscheid GmbH |
Germany |
|
|
|
|
|
|
Software used : Advance Steel.
Audi’s new “Production-hall N24” was the first project of Stahlbau Wegscheid GmbH done with Advance Steel. The production hall has a three-dimensional roof structure made from single bars and joints. A room for technical activities, which was built next to this construction, was created with trusses.
|
|
"The direct integration into the production process using an NC-interface and the low error rate due to the collision control enabled faster and more precise work. The excellent 3D-modeling, the automatic updates of manual changes in all technical documents and last but not least the good price-performance ratio of this software convinced us."
Mr. Andreas Obermaier, EDV-Manager of Stahlbau Wegscheid
|
|
| |
|
|
|
|
| Residential building complex. Pipera, Romania. |
ASCO Constructii |
Romania |
|
|
|
|
|
|
Software used : Advance Concrete.
The “Liziera Residence” project is a complex residential building in Pipera, in the North of Bucharest.
|
|
"I am very enthusiastic about the simple and intuitive modeling of Advance Concrete, especially the way that large projects can be managed. Working as a team by splitting the model, saved us time and increased our efficiency. This is a good enough reason for using Advance Concrete for other projects."
Mr. E. Ghenade, Project Manager at ASCO Constructii
|
|
| |
|
|
|
|
| Warehouse for explosive products. Slobozia, Romania. |
N-CAD Proiect |
Romania |
|
|
|
|
|
|
Software used : Advance Steel.
The roof of this warehouse has an arc steel structure, with a 72m span.
|
|
"From my point of view, designing such a structure in less than 3 weeks is a success achieved entirely due to Advance Steel. It would be almost impossible to handle such a project without dedicated software like Advance Steel."
Mr. E. Nestor, General Manager of N-CAD Proiect
|
|
| |
|
|
|
|
| Booster Heater 3V-3. Schwedt, Germany. |
Heurtey Petrochem Romania |
Romania |
|
|
|
|
|
|
Software used : Advance Steel.
The booster heater has a steel structure split into two sections – convection and radiation – built with beams and welded prefabricated panels.
|
|
"I must admit that I was impressed with the software versatility and the flexibility for designing structures for the hydrocarbon industry."
Arch. V. Croitoru, Project Manager at Heurtey Petrochem Romania
|
|
| |
|
|
|
|
| Băneasa Business and Technology Park. Băneasa, Romania. |
Inginerie Structurală |
Romania |
|
|
|
|
|
|
Software used : Advance Design.
Baneasa Business and Technology Park is a business complex covering a total area of more than 160.000 ms, designed to be headquarters of large companies, business conferences, etc.
|
|
"Using Graitec programs for 4 years and being familiar with their good performance, I accepted a new challenge: to use the new structural analysis software Advance Design for modeling the project. … I was able to deliver in a very short time this impressive BPPT project!"
Ms. Diana Zagaican, General Manager of Inginerie Structurală
|
|
| |
|
|
|
|
| SCCV Nathalie. Le Havre, France. |
Finaxiome |
France |
|
|
|
|
|
|
Software used : Advance Concrete.
28 residences. R+3 with a basement 2100 m2. Half-buried basement, flat roof, and superficial foundations.
|
|
"We are searching for a coherent, efficient and easy to use CAD / Calculation chain. Main objectiv: avoid data re-entering and errors. We have two Advance licenses and we will pass to 6, plus Arche. The software is really easy to use. The main advantage of Advance+Arche is the high productivity. We also gain quality due to 3D."
Mr. Bourgeois, Design Office Manager at Finaxiome
|
|
| |
|
|
|
|
| The New Milano Fair. Milano, Italy. |
Ingenieur-Büro Emmerling GmbH |
Germany |
|
|
|
|
|
|
Software used : Advance Steel.
The "New Milano Fair" was designed from the ground up to be the biggest fairground of the world with an exhibition space of 2 millions m². The Exhibition halls are connected by a freeform roof called VELA (Italian for sails).
|
|
"Due to automatic modeling of tree columns, crosses and leveling points in 3D in addition to automatic drawing creation to contractor requirements we saved 1.900 man-days. This is a time saving of 60%! This was due to innovative Advance technology and great cooperation by Graitec from the start of the project to help us efficiently and productively accomplish the project."
Mr. Hubert Emmerling, owner of Emmerling GmbH
|
|
| |
|
|
|
|
| Amphitheater from Minatec. Grenoble, France. |
TECBAT |
France |
|
|
|
|
|
|
Software used : Effel.
The 400 place amphitheater is located at the heart of Minatec, a major European Research Center for Innovation and Expertise in micro and nano-technology.
|
|
"We are very satisfied by the ease of use of the software and the speed at which we can deliver projects. We can almost automatically send the Arche automatic reinforced beams on site, indeed an important time saver."
Ms. Dupuis, Structure Engineer, TECBAT
|
|
| |
|
|
|
|
| Weather Radar Tower. Bermudas. |
Conferdo GmbH & Co. KG |
Germany |
|
|
|
|
|
|
Software used : Advance Steel.
This modern and powerfull weather radar is built to allow detailed weather forecasts for Bermuda. The supporting framework has a stairtower access and was built to withstand hurricane velocity winds.
|
|
"We have been using Advance for 2 years and are very satisfied with it's capabilities."
Mr. Rainer Bach, CONFERDO top manager
|
|
| |
|
|
|
|
| UFO Zoetermeer Project. Zoetermeer, Netherlands. |
CSM |
Belgium |
|
|
|
|
|
|
Software used : Advance Steel.
The "UFO ZOETERMEER" (the flying saucer of Zoetermeer) is a sports hall in the Zoetermeer shopping center.
|
|
"...the complex geometry featuring curved bars and custom connections was an easy task with Advance and demonstrates the amazing potential of the software."
Mr. Eddy Vrolyx, CSM Project Manager
|
|
| |
|
|
|
|
| Zlote Tarasy - Golden Terraces. Warsaw, Poland. |
Waagner-Biro Stahl-Glas-Technik |
Austria |
|
|
|
|
|
|
Software used : Advance Steel.
The unique Multi-Purpose-Center in the middle of Warsaw reaches 225.000 m˛. The fancy, sinuous steel glass roof having a total of 10.200 m˛ was elaborated by the Vienna Specialist Waagner-Biro Stahl-Glas-Technik.
|
|
"...we appreciate the time saving and efficiency gain as a result of, for example, the automatic creation of NC-files or bill of material."
Mr. Gerald Schmidt, Design Coordinator at Waagner Biro SGT
|
|
| |
|
|
|
|
| SCI Boileau Duquesne. Lyon, France. |
MATTE |
France |
|
|
|
|
|
|
Software used : Arche.
85 Rooms Hospital Complex for elderly patients R+7 type cage with a single storey basement for 5000 m˛.
|
|
"Arche allows in general gaining time and quality. I estimate between 10% and 20%, the gain on the productivity."
Mr. Ondo, Structure Engineer, MATTE
|
|
| |
|
|
|
|
|