Customer Projects
The following are descriptions of a few GRAITEC customer projects created with Advance Design, Advance Concrete and Advance Steel. Project characteristics are briefly described along with the advantages of using the various GRAITEC solutions. Our customers have generously made available some DWF files for your perusal.
Headframe | Rouleau-Desaulniers | Canada
Software used : Advance Steel.
New extension of an existing headframe building for a mining company.
"The fact that Advance Steel is based on AutoCAD® made the 3D modeling of the project easy. This is necessary to avoid any interference between the mechanical equipment and the structural and miscellaneous elements."
Marc DESAULNIERS, Project Manager, Rouleau-Desaulniers
- Rouleau-Desaulniers : Headframe Project presentation PDF format.
- Rouleau-Desaulniers : Headframe Project PPT presentation PPT presentation in PDF format.
- Rouleau-Desaulniers : Headframe Reference page HTML format.
Sun-Shading Structure | Metallerie du Cambresis | France
Software used : Advance Steel.
Installation of a shading steel structure on the façade of an office building.
"This project was not very complicated, but Advance Steel allowed me to design the fixing details of the structure with the rendered and 3D navigation."
Mehdi BRENNE, Draftsman, Metallerie du Cambresis
- Metallerie du Cambresis : Sun-Shading Structure Project presentation PDF format.
- Metallerie du Cambresis : Sun-Shading Structure Project PPT presentation PPT presentation in PDF format.
- Metallerie du Cambresis : Sun-Shading Structure Reference page HTML format.
Residential building | EBS | France
Software used : Advance Concrete.
A Residential building with a complex structure, located in a highly urbanized area.
"Advance Concrete gives me great personal satisfaction. The software answers our desire to produce nice drawings. The margin of error is very limited, which is reassuring. We could allocate more time to details."
Thierry NOWAK, Draftsman, EBS
- EBS : Residential building Project presentation PDF format.
- EBS : Residential building Project PPT presentation PPT presentation in PDF format.
- EBS : Residential building Reference page HTML format.
Nuclear Power Station Extention | TPF Engineering | Belgium
Software used : Advance Steel.
The nuclear plant is extended with an extra reactor. TPF is in charge of the auxiliaries building.
"Advance Concrete had all the requirements for this project. The software enabled clear communication among the participants with the specification of design settings. We could find our way around in the model just with the colors."
Evelyne LACROIX, Project Manager,TPF Engineering
- TPF Engineering : Nuclear Power Station Extention Project presentation PDF format.
- TPF Engineering : Nuclear Power Station Extention Project PPT presentation PPT presentation in PDF format.
- TPF Engineering : Nuclear Power Station Extention Reference page HTML format.
Tong-Yu Factory | JIA Construction Co Ltd | Taiwan
Software used : Advance Steel.
The project represents 540-ton steel structure of a factory building.
"Advance Steel is very easy to use; it was quick to learn. We could find the design issues in the model and discuss the changes. Advance Steel allowed us to reduce the construction cost losses."
Chris Liu, Main structural shop drawing engineer
- JIA Construction Co Ltd : Tong-Yu Factory Project presentation PDF format.
- JIA Construction Co Ltd : Tong-Yu Factory Project PPT presentation PPT presentation in PDF format.
- JIA Construction Co Ltd : Tong-Yu Factory Reference page HTML format.
Roof construction for a bus and tram station | Bitschnau Stahl, Bitschnau Project gmbh & Anlagenbau GmbH | Germany
Software used : Advance Steel.
The bus and tram station, "Münchner Freiheit", has got a new steel roof. Dimensions: 73 m long, 31 m wide, total area: 1540 m2
"Advance Steel is an excellent program for complex steel constructions. We appreciate the time saving and the rise in productivity."
Mr. Manfred Ammann, Manager of the Construction and Project office at Bitschnau GmbH
- Bitschnau Stahl, Bitschnau Project gmbh & Anlagenbau GmbH : Roof construction for a bus and tram station Project presentation PDF format.
- Bitschnau Stahl, Bitschnau Project gmbh & Anlagenbau GmbH : Roof construction for a bus and tram station Project PPT presentation PPT presentation in PDF format.
- Bitschnau Stahl, Bitschnau Project gmbh & Anlagenbau GmbH : Roof construction for a bus and tram station Reference page HTML format.
Extension of the University of Leipzig | Architektur- und Konstruktionsbüro Dipl.-Ing. Eduardo Cerda | Germany
Software used : Advance Steel.
Within the frame of the reconstruction and extension of the University of Leipzig an impressive main building is created.
"Without using Advance Steel with its excellent functions for such demanding objects, I would not have been able to realize this project."
Mr. Eduardo Cerda, Manager and construction engineer of the Architektur- und Konstruktionsbüro Dipl.-Ing. Eduardo Cerda
- Architektur- und Konstruktionsbüro Dipl.-Ing. Eduardo Cerda : Extension of the University of Leipzig Project presentation PDF format.
- Architektur- und Konstruktionsbüro Dipl.-Ing. Eduardo Cerda : Extension of the University of Leipzig Project PPT presentation PPT presentation in PDF format.
- Architektur- und Konstruktionsbüro Dipl.-Ing. Eduardo Cerda : Extension of the University of Leipzig Reference page HTML format.
House made of steel | Metal Adour | France
Software used : Advance Steel.
The project represents a steel structure of a house with the following dimensions: 15m x 10m x 7m height.
"I appreciate the easy modeling Advance Steel enables, the smartness of automated dimensioning and the easy modification of dimensions for the customization of our drawings. The use of Advance Steel is easy for someone who already knows a 3D Steel detailing tool."
Mathieu Roussé, Draftsman
- Metal Adour : House made of steel Project presentation PDF format.
- Metal Adour : House made of steel Project PPT presentation PPT presentation in PDF format.
- Metal Adour : House made of steel Reference page HTML format.
An upside down house | Husmann Stahlbau GmbH | Germany
Software used : Advance Steel.
The project represents a house standing on its roof. The house is a new addition to the indoor playground Pirateninsel Rügen. Total weight of the steel structure: 61.1 tons.
"Without the use of Advance Steel with its 3D functions, the realization of this project would not have been possible for us."
Mr. Moenter, Construction Engineer at Husmann Stahlbau GmbH
- Husmann Stahlbau GmbH : An upside down house Project presentation PDF format.
- Husmann Stahlbau GmbH : An upside down house Project PPT presentation PPT presentation in PDF format.
- Husmann Stahlbau GmbH : An upside down house Reference page HTML format.
Helicopter base for Trier Hospital | Stahlbau Ziemann GmbH | Germany
Software used : Advance Steel.
Project description: Helicopter base connected a special elevator to the emergency room. Total weight: approximately 310 tons for the steel construction
"With its excellent functions Advance Steel supported us in fulfilling all these necessary and challenging demands for this special helicopter base."
Mr. Matthias Thul, Construction engineer Stahlbau Ziemann GmbH
- Stahlbau Ziemann GmbH : Helicopter base for Trier Hospital Project PPT presentation PPT presentation in PDF format.
- Stahlbau Ziemann GmbH : Helicopter base for Trier Hospital Project presentation PDF format.
- Stahlbau Ziemann GmbH : Helicopter base for Trier Hospital Reference page HTML format.
Hospital extension La-Roche-Sur-Lyon | Sigma Ingénierie | France
Software used : Advance Design.
Specifications of the project: Creation of 3 concrete frames in order to build an extension over 2 existing buildings still in use.
"Advance Design and Advance Concrete help viewing the building in 3D and optimizing our productivity both from the design and the drawing point of views. The software enables intuitive and user friendly data processing which shortens the adaptation time."
Nicolas BRETON, Denis LAMBERT, Sigma Ingénierie
- Sigma Ingénierie : Hospital extension La-Roche-Sur-Lyon Project presentation PDF format.
- Sigma Ingénierie : Hospital extension La-Roche-Sur-Lyon Project PPT presentation PPT presentation in PDF format.
- Sigma Ingénierie : Hospital extension La-Roche-Sur-Lyon Reference page HTML format.
Business Center | LAUNET Design Office | France
Software used : Advance Steel.
The project consists of a hall of 1000 m2, offices of 180 m2, 53 tons in total.
"The biggest advantage was the file transfer to the manufacturing site. Advance Steel offers a high manufacturing quality which is due to significant error minimization and easy mounting at site.
"
Mr Vielle, Manager of Launet Design Office
- LAUNET Design Office : Business Center Project presentation PDF format.
- LAUNET Design Office : Business Center Project PPT presentation PPT presentation in PDF format.
- LAUNET Design Office : Business Center Reference page HTML format.
Interior stairs | ABC Serrurerie | France
Software used : Advance Steel.
The project represents interior steel stairs (inside a private new house) with the railing treads and top handrail made from wood
"This is one of my first projects using Advance Steel, which allowed me to design the stairs that were not simple; the visualization in 3D and in render mode was a great help, and the 3D and 2D details on drawings were useful for fabrication and erection at site."
Mr. Bordas, Detailer within the company
- ABC Serrurerie : Interior stairs Project presentation PDF format.
- ABC Serrurerie : Interior stairs Project PPT presentation PPT presentation in PDF format.
- ABC Serrurerie : Interior stairs Reference page HTML format.
TRESORER II | SAI Design Office | France
Software used : Advance Steel.
The project represents a steel structure with a surface of 50 m2 and a weight of 1500 kg.
"Advance Steel helps us save a lot of time during the modeling and the fabrication of our steel structures. It proves to be a very responsive software solution when project modifications occur."
Mr. Fenix, Steel detailer
- SAI Design Office : TRESORER II Project presentation PDF format.
- SAI Design Office : TRESORER II Project PPT presentation PDF format.
- SAI Design Office : TRESORER II Reference page HTML format.
Théatre de l'Archipel | OMNIS Bâtiment | France
Software used : Advance Design.
'Théatre de l'Archipel' was calculated with Advance Design.
"Advance Design was a great help in realizing this model thanks to the software ergonomy, the multi-view display, the display filters and the numerous color options, especially for determining the intersections of all curved surfaces."
Mr. Jennan, associated engineer
- OMNIS Bâtiment : Théatre de l'Archipel Project presentation PDF format.
- OMNIS Bâtiment : Théatre de l'Archipel Project PPT presentation PPT presentation in PDF format.
- OMNIS Bâtiment : Théatre de l'Archipel Reference page HTML format.
Aerial Tower | Biuro Inżynierskie Michał Nowicki & Biuro Inżynierskie Tomasz Białek | Poland
Software used : Advance Steel.
The project represents a steel tower supported by 1 level of cables elements with supporting elements for antenna.
"Make use of interoperability between Advance Design and Advance Steel makes calculation and detailing processes very quick and efficient. Moreover, Advance software supports designer in case of any changes in the model and documentation during all stages of the project cycle."
Mr. Michał Nowicki, Designer
- Biuro Inżynierskie Michał Nowicki & Biuro Inżynierskie Tomasz Białek : Aerial Tower Project presentation PDF format.
- Biuro Inżynierskie Michał Nowicki & Biuro Inżynierskie Tomasz Białek : Aerial Tower Project PPT presentation PPT presentation in PDF format.
- Biuro Inżynierskie Michał Nowicki & Biuro Inżynierskie Tomasz Białek : Aerial Tower Reference page HTML format.
Aerial Tower | Biuro Inżynierskie Tomasz Białek | Poland
Software used : Advance Steel.
Steel tower with supporting elements for antenna.
"Make use of interoperability between Advance Design and Advance Steel makes calculation and detailing processes very quick and efficient. Moreover, Advance software supports designer in case of any changes in the model and documentation during all stages of the project cycle."
Mr. Michał Nowicki, Designer
- Biuro Inżynierskie Tomasz Białek : Aerial Tower Project presentation PDF format.
- Biuro Inżynierskie Tomasz Białek : Aerial Tower Project PPT presentation PPT presentation in PDF format.
- Biuro Inżynierskie Tomasz Białek : Aerial Tower Reference page HTML format.
Aerial Mast H=317 m | Biuro Inżynierskie Michał Nowicki | Poland
Software used : Advance Design.
The project represents a steel mast supported by 5 levels of cables elements.
"During exploitation elements of high mast structure are open to large displacement. Advance Design makes possible to run non-linear analysis for these elements."
Mr. Michał Nowicki, Designer
- Biuro Inżynierskie Michał Nowicki : Aerial Mast H=317 m Project presentation PDF format.
- Biuro Inżynierskie Michał Nowicki : Aerial Mast H=317 m Project PPT presentation PPT presentation in PDF format.
- Biuro Inżynierskie Michał Nowicki : Aerial Mast H=317 m Reference page HTML format.
Set of Concrete Silos | Biuro Inżynierskie Michał Nowicki & Biuro Projektów Projbet Piotr Krefta | Poland
Software used : Advance Design.
The project represents a reinforced concrete construction consisting of 18 different chambers.
"Advance Design makes design process very efficient for concrete planar elements."
Mr. Michał Nowicki, Designer
- Biuro Inżynierskie Michał Nowicki & Biuro Projektów Projbet Piotr Krefta : Set of Concrete Silos Project presentation PDF format.
- Biuro Inżynierskie Michał Nowicki & Biuro Projektów Projbet Piotr Krefta : Set of Concrete Silos Project PPT presentation PPT presentation in PDF format.
- Biuro Inżynierskie Michał Nowicki & Biuro Projektów Projbet Piotr Krefta : Set of Concrete Silos Reference page HTML format.
Manufacture Hall | Biuro Inżynierskie Michał Nowicki & Biuro Inżynierskie Tomasz Białek | Poland
Software used : Advance Design.
The project is a steel construction made of 12 frames which creates one level of superstructure to existing manufacture hall.
"Make use of interoperability between Advance Design and Advance Steel makes calculation and detailing processes very quick and efficient. Moreover, Advance software supports designer in case of any changes in the model and documentation during all stages of the project cycle."
Mr. Michał Nowicki, Designer
- Biuro Inżynierskie Michał Nowicki & Biuro Inżynierskie Tomasz Białek : Manufacture Hall Project presentation PDF format.
- Biuro Inżynierskie Michał Nowicki & Biuro Inżynierskie Tomasz Białek : Manufacture Hall Project PPT presentation PPT presentation in PDF format.
- Biuro Inżynierskie Michał Nowicki & Biuro Inżynierskie Tomasz Białek : Manufacture Hall Reference page HTML format.
Fire Escape | SPRL LARDINOIS | Belgium
Software used : Advance Steel.
The project represents a multi-level fire escape.
"Advance Steel is a very good solution for industrial detailing. In addition, the software has a short learning curve for professionals who already use AutoCAD."
Mr. Barillet, Draftsman
- SPRL LARDINOIS : Fire Escape Project presentation PDF format.
- SPRL LARDINOIS : Fire Escape Project PPT presentation PPT presentation in PDF format.
- SPRL LARDINOIS : Fire Escape Reference page HTML format.
Transmission tower - height 76 M | KD Consulting & Biuro Inżynierskie Michał Nowicki | Poland
Software used : Advance Steel.
The project represents the recovery of a transmission Tower measuring 76 m height. Engineers first recreated the model of the existing structure and, then, proposed new geometry solutions.
"Advance Steel does not only give the opportunity to create complete workshop documentation, it also provides a lot of very useful information for the design and construction process. Professional technical support is a big advantage especially in the phase of the software implementation and regular work afterward."
Mr. Michal Nowicki, Main Designer
- KD Consulting & Biuro Inżynierskie Michał Nowicki : Transmission tower - height 76 M Project presentation PDF format.
- KD Consulting & Biuro Inżynierskie Michał Nowicki : Transmission tower - height 76 M Project PPT presentation PPT presentation in PDF format.
- KD Consulting & Biuro Inżynierskie Michał Nowicki : Transmission tower - height 76 M Reference page HTML format.
Stock-taking project of transmission tower - height 28 M | KD Consulting & Biuro Inżynierskie Michał Nowicki | Poland
Software used : Advance Steel.
The project represents the recovery of a transmission Tower measuring 28 m height. Engineers first recreated the model of the existing structure and, then, proposed new geometry solutions.
"Advance Steel gives opportunity not only to create complete workshop documentation, it also provides a lot of information, which are very useful for designing and construction process.
Professional technical support is a big advantage especially in phase of software implementation and regular work afterward.
"
Mr. Michal Nowicki, Main Designer
- KD Consulting & Biuro Inżynierskie Michał Nowicki : Stock-taking project of transmission tower - height 28 M Project presentation PDF format.
- KD Consulting & Biuro Inżynierskie Michał Nowicki : Stock-taking project of transmission tower - height 28 M Project PPT presentation PDF format.
- KD Consulting & Biuro Inżynierskie Michał Nowicki : Stock-taking project of transmission tower - height 28 M Reference page HTML format.
University of Ljubljana | Elea iC d.o.o | Slovenia
Software used : Advance Steel.
The project is a new building for a library and several large lecture rooms for the Faculty of Chemistry and Chemical Technology at the University of Ljubljana, in Slovenia.
"Advance Steel has increased our productivity and even made it possible to model the complex geometry of this structure in the first place. We especially appreciate its automatic detailing capabilities and easy manual adjustments to shop drawings."
Mr. Marko PAVLINJEK, ELEA iC - Structural engineer
- Elea iC d.o.o : University of Ljubljana Project presentation PDF format.
- Elea iC d.o.o : University of Ljubljana Project PPT presentation PPT presentation in PDF format.
- Elea iC d.o.o : University of Ljubljana Reference page HTML format.
OC NOVA KAROLINA | JAPE-projekt, spol. s.r.o. | Czech Republic
Software used : Advance Concrete.
The project consists of a reinforced concrete structure with supporting columns and concrete bracing cores around staircase shafts.
"Advance Concrete allowed us to work with the last changes at the last minute. Advance Concrete still respects the project deadlines and has a permanent overview of quantity of consumed concrete and area of used shutter."
Ing. Jan PERLA, Managing Director
- JAPE-projekt, spol. s.r.o. : OC NOVA KAROLINA Project presentation PDF format.
- JAPE-projekt, spol. s.r.o. : OC NOVA KAROLINA Project PPT presentation PPT presentation in PDF format.
- JAPE-projekt, spol. s.r.o. : OC NOVA KAROLINA Reference page HTML format.
AZ-TOWER BRNO | JAPE-projekt, spol. s.r.o. | Czech Republic
Software used : Advance Concrete.
The project consists of a reinforced concrete structure with supporting columns and concrete bracing cores around staircase shafts. East foreside wall is three times cranked.
"Advance Concrete allowed us to work with the last changes at the last minute. Advance Concrete still respects the project deadlines and has a permanent overview of quantity of consumed concrete and area of used shutter."
Ing. Jan PERLA, Managing Director
- JAPE-projekt, spol. s.r.o. : AZ-TOWER BRNO Project presentation PDF format.
- JAPE-projekt, spol. s.r.o. : AZ-TOWER BRNO Project PPT presentation PPT presentation in PDF format.
- JAPE-projekt, spol. s.r.o. : AZ-TOWER BRNO Reference page HTML format.
Centre Pompidou Metz | CTE | France
Software used : Advance Design.
The structure of this project also consists of a building with 7 levels, a studio and a circular shaped restaurant and a hexagonal tower with a steel cover rising to 77m height and a concrete/steel front.
"The Centre Pompidou-Metz has been an important challenge in terms of structural analysis for our engineer's staff which called upon all their skills. Today, this project is one of the most exceptional references for our Design office alongside others such as the Grenoble Stadium located in a seismic area, the Strasbourg Hospital (108m long building without any dilatation joint), etc."
Mr. Thierry HUMMEL, CTE Design Office
- CTE : Centre Pompidou Metz Project presentation PDF format.
- CTE : Centre Pompidou Metz Project PPT presentation PPT presentation in PDF format.
- CTE : Centre Pompidou Metz Reference page HTML format.
Platforms & Staircases | BGN (Baré Grolleau Nivault) | France
Software used : Advance Steel.
The project represents the restoration of internal stairs and railings of the City Council building from Niort
"Advance Steel enabled me to create documents with greater confidence; this is why I will never go back to working in 2D!"
Mr. Fays, Steel Designer
- BGN (Baré Grolleau Nivault) : Platforms & Staircases Project presentation PDF format.
- BGN (Baré Grolleau Nivault) : Platforms & Staircases Project PPT presentation PPT presentation in PDF format.
- BGN (Baré Grolleau Nivault) : Platforms & Staircases Reference page HTML format.
Coke oven gas desulphurization | HUTNI PROJEKT Frydek-Mistek a.s. | Slovakia
Software used : Advance Steel.
The project is a coke oven gas desulphurization in Kosice, Slovakia.
"Using Advance Steel, we were able to model together steel elements with equipments and check the interference between them."
Roman Lisnik, Designer Engineer
- HUTNI PROJEKT Frydek-Mistek a.s. : Coke oven gas desulphurization Project PPT presentation PPT presentation in PDF format.
- HUTNI PROJEKT Frydek-Mistek a.s. : Coke oven gas desulphurization Project presentation PDF format.
- HUTNI PROJEKT Frydek-Mistek a.s. : Coke oven gas desulphurization Reference page HTML format.
Wind Power Plant | Conferdo GmbH & Co. KG | Germany
Software used : Advance Steel.
The project represents a wind power plant located in Esterwegen, Germany.
"We have been using Advance Steel for many years and we are very satisfied with the software.
"
Rainer Bach and Georg Stichternath, Managing Director at Conferdo GmbH & Co. KG
- Conferdo GmbH & Co. KG : Wind Power Plant Project presentation PDF format.
- Conferdo GmbH & Co. KG : Wind Power Plant Project PPT presentation PPT presentation in PDF format.
- Conferdo GmbH & Co. KG : Wind Power Plant Reference page HTML format.
Tongon Gold Project | Dantu Drafting | Ivory Coast
Software used : Advance Steel.
The project is located in Ivory Coast, West Africa and has a total mass of 204.209 tons. The Roll-Off Material tip consists of a bin which is fed raw material by a D777 dump truck, from here an Apron feeder extracts the material.
"We found that the speed and ease of modeling in Advance Steel was unmatched by any other package in the current market place. The transformation from AutoCAD to Advance steel can be done within a short period of time thus making the change quick and inexpensive."
Clinton Dantu, Draftsman, Dantu Drafting
- Dantu Drafting : Tongon Gold Project Project PPT presentation PPT presentation in PDF format.
- Dantu Drafting : Tongon Gold Project Project presentation PDF format.
- Dantu Drafting : Tongon Gold Project Reference page HTML format.
Interior stairs | Ets J-C FASSLER | France
Software used : Advance Steel.
Turning stairs with double quarter turns for a bank agency of Caisse d'Epargne Lorraine Champagne Ardennes in the city of Villers-les Nancy
"Without Advance Steel, it would have been more difficult to design such a stair where most of the parts are different because of the stairs' complexity."
Olivier RASQUIER, Draftsman, Ets J-C FASSLER
- Ets J-C FASSLER : Interior stairs Project presentation PDF format.
- Ets J-C FASSLER : Interior stairs Project PPT presentation PPT presentation in PDF format.
- Ets J-C FASSLER : Interior stairs Reference page HTML format.
Office stairs | Ets J-C FASSLER | France
Software used : Advance Steel.
The project "Office Stairs" consists in straight parallel stairs with 2 intermediate platforms, railing and handrail attached to the wall for the Hartmann's company headquarters.
"I was forced to change the entire 3D model (because of a modification on the concrete) while everything was finished, but this has been very easy and fast thanks to Advance Steel's functionalities."
Olivier RASQUIER, Draftsman, Ets J-C FASSLER
- Ets J-C FASSLER : Office stairs Reference page HTML format.
- Ets J-C FASSLER : Office stairs Project presentation PDF format.
- Ets J-C FASSLER : Office stairs Project PPT presentation PPT presentation in PDF format.
Geriatric Psychiatric Pavilion | BETMI | France
Software used : Advance Concrete.
The project represents a geriatric psychiatric pavilion of 25 units including a basement and a first floor with patios and a partially vegetated flat roof that supports solar panels.
"Advance generates drawings with integrated isometric views so that the masons get a direct reading of volumes, which is refined using the cuts and plan views. For them, the isometric views are great. For example, they get a maximum of information on rolling shutters embedded with blind parts."
Mr. Patrice GUIOT
- BETMI : Geriatric Psychiatric Pavilion Project presentation PDF format.
- BETMI : Geriatric Psychiatric Pavilion Project PPT presentation PPT presentation in PDF format.
- BETMI : Geriatric Psychiatric Pavilion Reference page HTML format.
'Saint Elisabeta' Dormitory | S.C. ELMAC IMPORT EXPORT S.R.L. | Romania
Software used : Advance Steel.
For architectural considerations a boxed ceiling was chosen. The boxed ceiling is used over all levels of structure and represents the biggest challenge for formwork and reinforcement drawings.
"Using Advance Concrete, formwork drawings were created automatically, which resulted in a dramatic shortening of working time for this project. The reinforcement was made easily due to the simple and intuitive way of how bars are created. Bar numbering, bar details and their symbols were also created automatically. After seeing what it means to work with a 3D model, to visualize an entire structure detailed, not just lines, I wouldn't go back to working in 2D."
Mr. Mleşniţe Ioan, Engineer
- S.C. ELMAC IMPORT EXPORT S.R.L. : 'Saint Elisabeta' Dormitory Project presentation PDF format.
- S.C. ELMAC IMPORT EXPORT S.R.L. : 'Saint Elisabeta' Dormitory Project PPT presentation PPT presentation in PDF format.
- S.C. ELMAC IMPORT EXPORT S.R.L. : 'Saint Elisabeta' Dormitory Reference page HTML format.
Installation for gas desulfurization with pumps and blowers | PROFESIONAL CONSTRUCT PROIECTARE | Romania
Software used : Advance Steel.
The structure of the building includes three parts: an absorber, a station for pumps and blowers and house for elevator, scale and process tanks.
"We have been using Advance Steel for over 4 years. The 3D viewer allows identifying problems, collision detection and evaluating the possibilities to implement our ideas to the structure. Models of large dimensions can be handled easily due to the Multi-User system that gives us the possibility to save a lot of time."
Mr. Dan BATCA, Project Manager
- PROFESIONAL CONSTRUCT PROIECTARE : Installation for gas desulfurization with pumps and blowers Project presentation PDF format.
- PROFESIONAL CONSTRUCT PROIECTARE : Installation for gas desulfurization with pumps and blowers Project PPT presentation PPT presentation in PDF format.
- PROFESIONAL CONSTRUCT PROIECTARE : Installation for gas desulfurization with pumps and blowers Reference page HTML format.
Restoration of waste incinerator | Aciercon s.r.o. | Slovakia
Software used : Advance Steel.
The project represents the steel structures of a boiler room for a waste incinerator plant. The structure has a total weight of 530 tones. It contains main support construction for the boiler tank.
"Advance Steel is suitable for such a complicated structure and was the perfect solution for this waste incinerator."
Ing. Oldrich Balsinek, Managing Director
- Aciercon s.r.o. : Restoration of waste incinerator Project presentation PDF format.
- Aciercon s.r.o. : Restoration of waste incinerator Project PPT Presentation PPT presentation in PDF format.
- Aciercon s.r.o. : Restoration of waste incinerator Reference page HTML format.
Liège law courts extension | TPF Engineering | Belgium
Software used : Advance Concrete.
Liège law courts extension is a major project that was already partly erected. It includes complex forms, such as: curved walls, honeycomb floors, prefabricated façade elements.
"The huge advantage of Advance Concrete is that for a team which manages modeling reinforcements, the use of the software is natural, therefore the training investment is reduced to a minimal."
Ms. Evelyne Lacroix, Project Manager
- TPF Engineering : Liège law courts extension Project presentation PDF format.
- TPF Engineering : Liège law courts extension Project PPT Presentation PPT presentation in PDF format.
- TPF Engineering : Liège law courts extension Reference page HTML format.
New exhibition centre hall | OKF s.r.o. | Czech Republic
Software used : Advance Steel.
The biggest exhibition hall in Central Europe with a free standing area of over 20000 m2 (steel frameworks of 2400 tons) holds a modern exhibition hall and a new entrance to the exhibition center. The steel load-bearing skeleton is composed by trusses with frame installations on both of its ends. The west-facade, made of glass supported by the steel sub-structure, represents the window-case in contrast with the simple geometry of the latest generation sandwich-panel cladding.
" With Advance Steel, the 3D modelling of steel frameworks of "Pavilion P" enabled the realization of the model complexity and the detail control in the workshop documentation. To expedite the tube structure fabrication, the information from the 3D was directly used for the fabrication of particular elements. Using Advance Steel improved the demanding deadlines both for the project and for the steel structure delivery period."
Vladimir Daněk, Michal Rudolf, OKF s.r.o., Technical designers
- OKF s.r.o. : New exhibition centre hall Project PPT Presentation PPT presentation in PDF format.
- OKF s.r.o. : New exhibition centre hall Project presentation PDF format.
- OKF s.r.o. : New exhibition centre hall Reference page HTML format.
Warehouse for concrete and tower for machinery | SC Pavial SRL | Romania
Software used : Advance Steel.
SC Pavial SRL designed “Warehouse for concrete and tower for machinery” project for Cemrom SA. With the help of Advance Design was possible for pillars to be articulated in foundation, made of grid sheet with variable section. 3D orientation, available in Advance Steel made possible the synchronization of the two models, tower and hall, in a single model.
"The changes due to technological theme change (relative to the hall or doors position) could be made effortlessly thanks to customizable connections in Advance Steel, while maintaining the line position of alike joints.
Plant weights were significant, particularly of concrete. The influence of vibration developed by this weight could be verified using a temporary dynamic analysis. Stairs and railings were made easily."
Panait Alexandru, General Manager, S.C. Pavial S.R.L.
- SC Pavial SRL : Warehouse for concrete and tower for machinery Project PPT presentation PPT presentation in PDF format.
- SC Pavial SRL : Warehouse for concrete and tower for machinery Project presentation PDF format.
- SC Pavial SRL : Warehouse for concrete and tower for machinery Reference page HTML format.
Ice and swimming stadium | Stahlhallen und Baustoffe Janneck GmbH | Germany
Software used : Advance Steel.
New stadium with three different areas (ice stadium, swimming pool and locker rooms/restaurants area), and an ice rink going around the building as a 1st floor
"Without the use of Advance Steel with its many excellent functions, especially the 3D ability, the realization of this project would not have been possible for us."
Mr. Manfred Dröge, Construction engineer
- Stahlhallen und Baustoffe Janneck GmbH : Ice and swimming stadium Project presentation PDF format.
- Stahlhallen und Baustoffe Janneck GmbH : Ice and swimming stadium Project PPT presentation PPT presentation in PDF format.
- Stahlhallen und Baustoffe Janneck GmbH : Ice and swimming stadium Reference page HTML format.
Canopy for Sheremetyevo International Airport / Moscow | Heinrich Lamparter Stahlbau & Co. KG GmbH | Germany
Software used : Advance Steel.
The arrival hall of the new terminal of the Moscow airport is connected to the parking garage with an overpass. The overpass has a double bend curved steel-roof construction, which was modeled in Advance Steel by Heinrich Lamparter Stahlbau GmbH & Co. KG.
"In Advance Steel the model is created with real dimensions thus making it possible to easily deal with complex situations that can occur during the assembly phase."
Mr. Linge, Manager of the Engineering Department
- Heinrich Lamparter Stahlbau & Co. KG GmbH : Canopy for Sheremetyevo International Airport / Moscow Project presentation PDF format.
- Heinrich Lamparter Stahlbau & Co. KG GmbH : Canopy for Sheremetyevo International Airport / Moscow Project PPT presentation PPT presentation in PDF format.
- Heinrich Lamparter Stahlbau & Co. KG GmbH : Canopy for Sheremetyevo International Airport / Moscow Reference page HTML format.
Mugam Evi Music House | NCA Container- und Anlagenbau GmbH | Austria
Software used : Advance Steel.
The concert hall consists of 500 tons of steel. A specific feature of the project was the creation of the whole steel construction. The construction mainly consists of three-dimensional rolled pipes. Additionally each single pipe had elliptical-shaped radii on two levels. The parts of the steel construction had to be connected in an elegant way, to give the building a perfect façade.
"The fact that Advance Steel processes all information from the 3D model automatically leads to the easy creation of the documents and enables the conformity of all drawings and documents."
Mr Dohr, Construction Engineer
- NCA Container- und Anlagenbau GmbH : Mugam Evi Music House Project presentation PDF format.
- NCA Container- und Anlagenbau GmbH : Mugam Evi Music House Project PPT presentation PPT presentation in PDF format.
- NCA Container- und Anlagenbau GmbH : Mugam Evi Music House Reference page HTML format.
Framework for a Filter System | AHP Arikan Ibrahim Konstruktionsbüro für Stahlbau | Germany
Software used : Advance Steel.
The project represents a steel structure of 10 tons total weight.
"Advance Steel increased our productivity by 75% thanks to the possibilities of fast modifications and adjustments along with the fast drawing derivation and the collisions check that allowed us to finish the construction in a short time."
Mr. Arikan, Managing Director
- AHP Arikan Ibrahim Konstruktionsbüro für Stahlbau : Framework for a Filter System Project presentation PDF format.
- AHP Arikan Ibrahim Konstruktionsbüro für Stahlbau : Framework for a Filter System Project PPT presentation PPT presentation in PDF format.
- AHP Arikan Ibrahim Konstruktionsbüro für Stahlbau : Framework for a Filter System Reference page HTML format.
Air Intake | Planungsbüro Heuer | Germany
Software used : Advance Steel.
The project represents an intake for a hydrogen plant.
"Advance Steel allowed us to process the entire 3D model data, accelerate the creation of all documents and ensured an all-around drawing consistency."
Mr. Heuer, Construction Engineer
- Planungsbüro Heuer : Air Intake Project presentation PDF format.
- Planungsbüro Heuer : Air Intake Project PPT presentation PPT presentation in PDF format.
- Planungsbüro Heuer : Air Intake Reference page HTML format.
Grenoble Stadium | ETI Design Office | France
Software used : Advance Steel.
The project represents a stadium having as specifications: 20,000 sitting capacity, 13,000 square meters of offices, 65,000 square meters of extracted ground.
"Advance Steel was very useful thanks to the collision detection tool that enabled us to check nothing came between the various roof structure elements."
Mr Berger, ETI Project Manager
- ETI Design Office : Grenoble Stadium Project presentation PDF format.
- ETI Design Office : Grenoble Stadium Project PPT presentation PPT presentation in PDF format.
- ETI Design Office : Grenoble Stadium Reference page HTML format.
Touring stage for the U2 360° Tour | STAGECO | Belgium
Software used : Advance Steel.
STAGECO did the complete steel structure for the touring system (technical design, calculations and fabrication), which has a final structural weight of 240 tons per system, plus 70 tons steel ballast and base frames.
All workshop drawings were created by Advance Steel, providing all necessary information for an accurate fabrication.
"Advance Steel was the perfect tool to do the conception of this incredible steel structure."
Mr. Koen Peeters - STAGECO R&D project designer
- STAGECO : Touring stage for the U2 360° Tour Project presentation PDF format.
- STAGECO : Touring stage for the U2 360° Tour Project PPT presentation PPT presentation in PDF format.
- STAGECO : Touring stage for the U2 360° Tour Reference page HTML format.
Prunerov II Power Plant | Noving Ltd | Czech Republic
Software used : Advance Steel.
The model of the existing steel structure was designed for the reconstruction of the Prunerov II power plant. Noving s.r.o used a satellite geodetic measurement technique to obtain the power plant coordinates.
"The project required to combine our own measurement evaluation software with Advance Steel. Without Advance Steel we would not have been able to handle the whole project."
Mr. Novotny, Managing Director
- Noving Ltd : Prunerov II Power Plant Project presentation PDF format.
- Noving Ltd : Prunerov II Power Plant Project PPT presentation PPT presentation in PDF format.
- Noving Ltd : Prunerov II Power Plant Reference page HTML format.
Bicycle and Pedestrian Bridge | Planungsbüro Heuer | Germany
Software used : Advance Steel.
The project consists of a new bridge for bicycles and pedestrians that will be built over the Wupper river in Leichlingen, Germany. The structure modeled with Advance Steel has a total length of 42.60 meters and a span of 42 meters between the support axes. The superstructure is 4.475 meters wide including a width of 3 meters between the railings of the bridge.
"Advance Steel allowed us to process the entire 3D model data, accelerate the creation of all documents and insured an all-around drawing consistency."
Mr. Heuer, Construction Engineer
- Planungsbüro Heuer : Bicycle and Pedestrian Bridge Project presentation PDF format.
- Planungsbüro Heuer : Bicycle and Pedestrian Bridge Project PPT presentation PPT presentation in PDF format.
- Planungsbüro Heuer : Bicycle and Pedestrian Bridge Reference page HTML format.
Residential buildings - Le Jardin des Peintres | Structubat | France
Software used : Advance Concrete.
"Le Jardin des Peintres" is a project of 249 apartments in 20 buildings with a foundation of 650 piles. The construction drawings have been created using all modules of Advance Concrete and GRAITEC's data exchange system to Arche Structure
"Advance Concrete allowed us to quickly understand how the building was structured thanks to 3D visualisation, hence enabling us to significantly reduce the risk of errors."
Mr Bourgeois, Structubat Design Office Manager
- Structubat : Residential buildings - Le Jardin des Peintres Project presentation PDF format.
- Structubat : Residential buildings - Le Jardin des Peintres Project PPT presentation PPT presentation in PDF format.
- Structubat : Residential buildings - Le Jardin des Peintres Reference page HTML format.
La Mediacité | TPF Engineering | Belgium
Software used : Advance Concrete.
"La Mediacité" is a construction project aimed to revitalize the Longdoz site in Liège, Belgium. TPF Engineering has obtained the commission for the construction plans of a commercial complex of more than 160.000 sqm. and for the redevelopment of several streets. The design office used the Advance Concrete's functionalities to their maximum capabilities, especially the multi-user function of the program.
"The automatic creation of bar schedule allowed us to save a significant amount of time by avoiding the long checking process."
Ms. Evelyne Lacroix, Design Office Manager
- TPF Engineering : La Mediacité Project presentation PDF format.
- TPF Engineering : La Mediacité Project PPT presentation PPT presentation in PDF format.
- TPF Engineering : La Mediacité Reference page HTML format.
Wörthersee Stadium | NCA Container- und Anlagenbau GmbH | Austria
Software used : Advance Steel.
The "Wörthersee" stadium was constructed by NCA Container- und Anlagenbau GmbH from Austria. The new stadium was completely created for the football Euro Cup 2008. It has a capacity of 35000 seats. After the Euro Cup, it will be reduced to 15000 seats.
"Because of the automatic creation of the drawings and a collisions control, which is carried out regularly, the occurrence of error could be minimized. This function saved us a lot of time. Last but not least we were also convinced by the good price-performance ratio of the software.
"
Mr. Schrammel, Department Manager for Steel of NCA Container- und Anlagenbau GMBH
- NCA Container- und Anlagenbau GmbH : Wörthersee Stadium Project presentation PDF format.
- NCA Container- und Anlagenbau GmbH : Wörthersee Stadium Project PPT presentation PPT presentation in PDF format.
- NCA Container- und Anlagenbau GmbH : Wörthersee Stadium Reference page HTML format.
The Theatre Royal Modernisation | TSI Structures Ltd. | Great Britain
Software used : Advance Steel.
The project is part of a comprehensive modernization program concerning the Theatre Royal of Norwich. The modifications made by TSI Structures Ltd. included extending the auditorium circle by 3 metres; strengthening of the existing structure & entrance façade in order to allow the installation of a continuous steel balcony with back light advertising boards and canopy.
"Advance Steel was a key element in enabling us to achieve the required delivery, due to its easy of modelling complex structures and environments."
Mr. Nick Thompson, Manager of TSI Structures Ltd.
- TSI Structures Ltd. : The Theatre Royal Modernisation Reference page HTML format.
- TSI Structures Ltd. : The Theatre Royal Modernisation Project presentation. PDF format.
- TSI Structures Ltd. : The Theatre Royal Modernisation Project PPT presentation. PPT presentation in PDF format.
- TSI Structures Ltd. : The Theatre Royal Modernisation Project presentation PDF format.
Olympic Ski Jump | Bitschnau GmbH | Austria
Software used : Advance Steel.
The new ski jump for the Olympic Winter games was constructed by Bitschnau GmbH from Austria. The commission of the Bitschnau GmbH included the realization with workshop drawings and assembly of the ski jump, the referee tower and other steel elements of the jump.
"Advance increases our productivity and, therefore, also our work. The software was an excellent support when designing the jump, especially regarding all the constructive challenges."
Mr. Huber, Manager of Bitschnau GmbH
- Bitschnau GmbH : Olympic Ski Jump Reference page. HTML format.
- Bitschnau GmbH : Olympic Ski Jump Project presentation. PDF format.
- Bitschnau GmbH : Olympic Ski Jump Project PPT presentation. PPT presentation in PDF format.
Bridge Niederwartha | Plauen Stahl Technologie GmbH | Germany
Software used : Advance Steel.
Plauen Stahl Technologie GmbH constructed the cable-stayed bridge between Niederwartha and Meißen. The Bridge will consist of 1232 tons of steel and will be over the Elbe River. It will be the first cable-stayed bridge in Saxonia and the longest one in Germany.
"The low error-rate and the very good capability of the drawing updates provide us with a clearer and more exact construction. We are very satisfied with Advance Steel and the use of this software was a complete success for our work."
Mr. Streit, Construction Engineer of the Plauen Stahl Technologie GMBH
- Plauen Stahl Technologie GmbH : Bridge Niederwartha Project PPT presentation. PPT presentation in PDF format.
- Plauen Stahl Technologie GmbH : Bridge Niederwartha Project presentation. PDF format. PDF format.
- Plauen Stahl Technologie GmbH : Bridge Niederwartha Reference page. HTML format.
Canopy for a casino. Duisburg, Germany. | Innovations-Verbund-Systeme GmbH | Germany
Software used : Advance Steel.
The canopy at the main entrance of the casino in Duisburg was designed by Innovations-Verbund-Systeme GmbH & Co. KG. The canopy has a weight of 50 tons. It is fixed to the curved walls of the building at a height of 10 meters. The span of the canopy at the front side is 30 meters. The span at the entrance wall is much smaller which makes it look like a funnel.
"We are very satisfied with the ease of use of the Access database of Advance Steel. We were also convinced by the excellent customer support, the easy operation of the software and last but not least by the good price-performance ratio. The canopy of the casino in Duisburg is one of 150 projects we have designed with GRAITEC Advance Steel."
Peter Mertens, Structural Engineer - Construction at Innovations-Verbung-Systeme GMBH & CO. KG
- Innovations-Verbund-Systeme GmbH : Canopy for a casino. Duisburg, Germany. Reference page. HTML format.
- Innovations-Verbund-Systeme GmbH : Canopy for a casino. Duisburg, Germany. Project presentation. PDF format.
- Innovations-Verbund-Systeme GmbH : Canopy for a casino. Duisburg, Germany. Project PPT presentation. PPT presentation in PDF format.
Cherkassy Beach Hotel. Cherkassy, Ukraine. | Novotny Bauer & Partner ZT GmbH | Germany
Software used : Advance Concrete.
The Cherkassy Beach Hotel was designed by Novotny Bauer & Partner Ingenieurkonsulenten für Bauingenieurwesen Ziviltechniker GmbH. The building consists of 7 floors, 2 basements, an underground parking lot, a ballroom and a bowling hall.
"The main difficulties of the project resulted from the extensive changes of the model during the planning phase and the construction phase.
Advance Concrete is an excellent software to reduce these difficulties. The fact that Advance Concrete automatically processes all information from the 3D-model leads to easy creation of the documents and enables the conformity of all drawings and documents. After the model has been updated the drawings are also automatically updated and vice versa."
Mr. Christian Bauer, Graduate Engineer & Manager at Novotny Bauer & Partner ZT Gmbh
- Novotny Bauer & Partner ZT GmbH : Cherkassy Beach Hotel. Cherkassy, Ukraine. Reference page. HTML format.
- Novotny Bauer & Partner ZT GmbH : Cherkassy Beach Hotel. Cherkassy, Ukraine. Project presentation. PDF format.
- Novotny Bauer & Partner ZT GmbH : Cherkassy Beach Hotel. Cherkassy, Ukraine. Project PPT presentation. PPT presentation in PDF format.
Audi's new production-hall N24. Ingolstadt, Germany. | Stahlbau Wegscheid GmbH | Germany
Software used : Advance Steel.
Audi's new ;"Production-hall N24' was the first project of Stahlbau Wegscheid GmbH done with Advance Steel. The production hall has a three-dimensional roof structure made from single bars and joints. A room for technical activities, which was built next to th;is construction, was created with trusses.
"The direct integration into the production process using an NC-interface and the low error rate due to the collision control enabled faster and more precise work. The excellent 3D-modeling, the automatic updates of manual changes in all technical documents and last but not least the good price-performance ratio of this software convinced us."
Mr. Andreas Obermaier, EDV-Manager of Stahlbau Wegscheid
- Stahlbau Wegscheid GmbH : Audi's new production-hall N24. Ingolstadt, Germany. Reference page. HTML format.
- Stahlbau Wegscheid GmbH : Audi's new production-hall N24. Ingolstadt, Germany. Project presentation. PDF format.
- Stahlbau Wegscheid GmbH : Audi's new production-hall N24. Ingolstadt, Germany. Project PPT presentation. PPT presentation in PDF format.
Warehouse for explosive products. Slobozia, Romania. | N-CAD Proiect | Romania
Software used : Advance Steel.
The roof of this warehouse has an arc steel structure, with a 72m span.
"From my point of view, designing such a structure in less than 3 weeks is a success achieved entirely due to Advance Steel. It would be almost impossible to handle such a project without dedicated software like Advance Steel."
Mr. E. Nestor, General Manager of N-CAD Proiect
- N-CAD Proiect : Warehouse for explosive products. Slobozia, Romania. Reference page. HTML format.
- N-CAD Proiect : Warehouse for explosive products. Slobozia, Romania. Project presentation. PDF format.
- N-CAD Proiect : Warehouse for explosive products. Slobozia, Romania. Project PPT presentation. PPT presentation in PDF format.